U.S. DOE PINELLAS PLANT

7887 BRYAN DAIRY ROAD SUITE 260, LARGO, FL, 33777
No open violations Compliance record — not a listed provider
Compliance record, not a business listing. This facility is a hazardous-waste generator (it produces regulated waste as part of an unrelated business), not a waste-management vendor — it isn't eligible to be claimed or listed. Data below is shown for compliance transparency, sourced from EPA ECHO & RCRAInfo.

Facility identity · canonical

EPA Registry ID
110000875465
RCRA Handler ID(s)
FL6890090008
Generator status
—
County
PINELLAS
EPA Region
04
Active
Yes
NAICS
921190
334220
Coordinates
27.87233, -82.746863
Compliance summary · canonical · EPA source pulled Aug 11, 2026 · summary recalculated Aug 26, 2026
3-year compliance history Not in the compliance universe for any of the last 12 quarters
Not in universe In violation Significant non-compliance
Significant non-complier
No
Last inspection
Dec 3, 2025
Inspections (5 yr)
6
Informal actions (5 yr)
—
Formal actions (5 yr)
—
Total penalties
—
Permits & authorizations · canonical
No permits on record.
Violations · canonical · 17 total, 0 open
7 distinct violation categories on record:
CountCodeCategoryEPA description
4 264.A TSDF standards (permitted) Standards for Owners and Operators of HW TSDs: General
4 264.B TSDF standards (permitted) Standards for Owners and Operators of HW TSDs: General Facility Standards
3 264.J TSDF standards (permitted) Standards for Owners and Operators of HW TSDs: Tank Systems
2 262.C Generator standards Standards Applicable to Generators of HW: Pre-Transport Requirements Applicable to Small and Large Quantity Generators
2 268.A Land disposal restrictions Land Disposal Restrictions: General
1 262.A Generator standards Standards Applicable to Generators of HW: General
1 XXS State-specific requirement (broader than federal) State Statutory or Regulatory requirements that are broader-in-scope than the federal RCRA requirements
Most recent 8 of 17:
DeterminedCategoryStatusAgency
Oct 16, 2006
Generator standards
262.C · Standards Applicable to Generators of HW: Pre-Transport Requirements Applicable to Small and Large Quantity Generators
Resolved Oct 16, 2006 S
Oct 16, 2006
State-specific requirement (broader than federal)
XXS · State Statutory or Regulatory requirements that are broader-in-scope than the federal RCRA requirements
Resolved Oct 16, 2006 S
May 7, 1996
Generator standards
262.A · Standards Applicable to Generators of HW: General
Resolved May 7, 1996 E
Feb 1, 1994
TSDF standards (permitted)
264.J · Standards for Owners and Operators of HW TSDs: Tank Systems
Resolved Feb 21, 1994 S
Feb 1, 1994
TSDF standards (permitted)
264.J · Standards for Owners and Operators of HW TSDs: Tank Systems
Resolved Feb 21, 1994 S
Feb 1, 1994
TSDF standards (permitted)
264.J · Standards for Owners and Operators of HW TSDs: Tank Systems
Resolved Feb 21, 1994 S
Apr 30, 1993
Generator standards
262.C · Standards Applicable to Generators of HW: Pre-Transport Requirements Applicable to Small and Large Quantity Generators
Resolved May 1, 1993 S
Jul 9, 1991
TSDF standards (permitted)
264.B · Standards for Owners and Operators of HW TSDs: General Facility Standards
Resolved Jul 19, 1991 S
Inspection history · canonical · 50 total
DateTypeAgencyOutcome
Dec 3, 2025 COMPLIANCE EVALUATION INSPECTION (CEI) S In compliance
May 12, 2025 NON-FINANCIAL RECORD REVIEW (NRR) S In compliance
Mar 20, 2025 OPERATION AND MAINTENANCE INSPECTION (OAM) S In compliance
Mar 7, 2025 COMPLIANCE EVALUATION INSPECTION (CEI) S In compliance
Sep 24, 2024 NON-FINANCIAL RECORD REVIEW (NRR) S In compliance
Feb 14, 2024 COMPLIANCE EVALUATION INSPECTION (CEI) S In compliance
Feb 14, 2024 NON-FINANCIAL RECORD REVIEW (NRR) S In compliance
Jul 31, 2023 NON-FINANCIAL RECORD REVIEW (NRR) S In compliance
Showing 8 most recent of 50.

Data sources

EPA ECHO — this facility's detailed report — facility, compliance summary, permits, evaluations & violations
RCRAInfo evaluation and violation records for this facility are integrated into the ECHO report linked above — RCRAInfo's own public search doesn't offer a stable per-facility link. General source: EPA ECHO, EPA RCRAInfo.
Compliance, permit, and location data come straight from EPA and can't be edited. Contact info and description come from the business's claimed listing, if any. This profile is not an official regulatory determination.
EPA ECHO Exporter
Source snapshot pulled Aug 11, 2026 · batch 20260811T113837Z
EPA RCRAInfo (ECHO download)
Source snapshot pulled Aug 11, 2026 · batch 20260811T113837Z
Two different dates can appear on this page, and both are correct but mean different things: "Source snapshot pulled" above is when we last pulled that source's raw data — this is the date to check for source currency. "Recalculated" on the compliance summary is when we last recomputed that summary from the data on hand, which can land on a later date than the source pull itself — a later recalculation date does NOT mean the underlying source has data through that date.