QUALAWASH HOLDINGS, LLC

8332 WILCOX AVE., SOUTH GATE, CA, 90280
No open violations Compliance record — not a listed provider
Compliance record, not a business listing. This facility is a hazardous-waste generator (it produces regulated waste as part of an unrelated business), not a waste-management vendor — it isn't eligible to be claimed or listed. Data below is shown for compliance transparency, sourced from EPA ECHO & RCRAInfo.

Facility identity · canonical

EPA Registry ID
110000781182
RCRA Handler ID(s)
CA0000031997, CAD000031997
Generator status
Large Quantity Generator (LQG)
County
LOS ANGELES
EPA Region
09
Active
Yes
NAICS
325315
562998 · All other misc. waste management
488490
Coordinates
33.957233, -118.179705
Compliance summary · canonical · EPA source pulled Aug 11, 2026 · summary recalculated Aug 26, 2026
3-year compliance history In violation 1 of the last 12 quarters
Not in universe In violation Significant non-compliance
Significant non-complier
No
Last inspection
Nov 10, 2025
Inspections (5 yr)
4
Informal actions (5 yr)
—
Formal actions (5 yr)
—
Total penalties
—
Permits & authorizations · canonical
ProgramTypeStatusEffective
RCRA LQG Not reported Not reported
Type is EPA's RCRA handler classification. Permit status and effective date are not published in the RCRAInfo handler dataset.
Violations · canonical · 7 total, 0 open
4 distinct violation categories on record:
CountCodeCategoryEPA description
3 262.C Generator standards Standards Applicable to Generators of HW: Pre-Transport Requirements Applicable to Small and Large Quantity Generators
2 262.A Generator standards Standards Applicable to Generators of HW: General
1 265.D TSDF standards (interim status) Interim Status Standards for Owners and Operators of HW TSDs: Contingency Plan and Emergency Procedures
1 279.C Used oil management Standards for Used Oil: Generators
All violations:
DeterminedCategoryStatusAgency
Oct 15, 2025
Generator standards
262.C · Standards Applicable to Generators of HW: Pre-Transport Requirements Applicable to Small and Large Quantity Generators
Resolved Nov 10, 2025 S
Sep 7, 2022
Generator standards
262.C · Standards Applicable to Generators of HW: Pre-Transport Requirements Applicable to Small and Large Quantity Generators
Resolved Sep 14, 2022 S
Oct 26, 2009
Generator standards
262.C · Standards Applicable to Generators of HW: Pre-Transport Requirements Applicable to Small and Large Quantity Generators
Resolved Mar 15, 2010 E
Oct 26, 2009
TSDF standards (interim status)
265.D · Interim Status Standards for Owners and Operators of HW TSDs: Contingency Plan and Emergency Procedures
Resolved Mar 15, 2010 E
Nov 9, 2005
Generator standards
262.A · Standards Applicable to Generators of HW: General
Resolved Dec 12, 2005 S
Sep 28, 1999
Generator standards
262.A · Standards Applicable to Generators of HW: General
Resolved Feb 2, 2000 E
Sep 28, 1999
Used oil management
279.C · Standards for Used Oil: Generators
Resolved Feb 2, 2000 E
Inspection history · canonical · 10 total
DateTypeAgencyOutcome
Nov 10, 2025 COMPLIANCE EVALUATION INSPECTION (CEI) S In compliance
Oct 15, 2025 COMPLIANCE EVALUATION INSPECTION (CEI) S Violation found
Sep 14, 2022 COMPLIANCE EVALUATION INSPECTION (CEI) S In compliance
Sep 7, 2022 COMPLIANCE EVALUATION INSPECTION (CEI) S Violation found
May 8, 2019 COMPLIANCE EVALUATION INSPECTION (CEI) S In compliance
May 5, 2016 COMPLIANCE EVALUATION INSPECTION (CEI) S In compliance
Oct 26, 2009 COMPLIANCE EVALUATION INSPECTION (CEI) E Violation found
Jun 22, 2009 COMPLIANCE EVALUATION INSPECTION (CEI) S In compliance
Showing 8 most recent of 10.

Data sources

EPA ECHO — this facility's detailed report — facility, compliance summary, permits, evaluations & violations
RCRAInfo evaluation and violation records for this facility are integrated into the ECHO report linked above — RCRAInfo's own public search doesn't offer a stable per-facility link. General source: EPA ECHO, EPA RCRAInfo.
Compliance, permit, and location data come straight from EPA and can't be edited. Contact info and description come from the business's claimed listing, if any. This profile is not an official regulatory determination.
EPA ECHO Exporter
Source snapshot pulled Aug 11, 2026 · batch 20260811T113837Z
EPA RCRAInfo (ECHO download)
Source snapshot pulled Aug 11, 2026 · batch 20260811T113837Z
Two different dates can appear on this page, and both are correct but mean different things: "Source snapshot pulled" above is when we last pulled that source's raw data — this is the date to check for source currency. "Recalculated" on the compliance summary is when we last recomputed that summary from the data on hand, which can land on a later date than the source pull itself — a later recalculation date does NOT mean the underlying source has data through that date.