PREMIER PAINT AND BODY WORKS LLC

37 BEAL PKWY NE, FORT WALTON BEACH, FL, 32548
No open violations Compliance record — not a listed provider
Compliance record, not a business listing. This facility is a hazardous-waste generator (it produces regulated waste as part of an unrelated business), not a waste-management vendor — it isn't eligible to be claimed or listed. Data below is shown for compliance transparency, sourced from EPA ECHO & RCRAInfo.

Facility identity · canonical

EPA Registry ID
110002528284
RCRA Handler ID(s)
FLD032313785
Generator status
Very Small Quantity Generator (VSQG)
County
OKALOOSA
EPA Region
04
Active
Yes
NAICS
—
Coordinates
30.416515, -86.613404
Compliance summary · canonical · EPA source pulled Aug 11, 2026 · summary recalculated Aug 26, 2026
3-year compliance history Not in the compliance universe for any of the last 12 quarters
Not in universe In violation Significant non-compliance
Significant non-complier
No
Last inspection
Dec 16, 2020
Inspections (5 yr)
—
Informal actions (5 yr)
—
Formal actions (5 yr)
—
Total penalties
—
Permits & authorizations · canonical
ProgramTypeStatusEffective
RCRA CESQG Not reported Not reported
Type is EPA's RCRA handler classification. Permit status and effective date are not published in the RCRAInfo handler dataset.
Violations · canonical · 6 total, 0 open
4 distinct violation categories on record:
CountCodeCategoryEPA description
2 262.A Generator standards Standards Applicable to Generators of HW: General
2 XXS State-specific requirement (broader than federal) State Statutory or Regulatory requirements that are broader-in-scope than the federal RCRA requirements
1 261.A RCRA 261.A ID and Listing of HW: General
1 279.C Used oil management Standards for Used Oil: Generators
All violations:
DeterminedCategoryStatusAgency
Aug 6, 2020
Generator standards
262.A · Standards Applicable to Generators of HW: General
Resolved Dec 23, 2020 S
Aug 6, 2020
Used oil management
279.C · Standards for Used Oil: Generators
Resolved Dec 8, 2020 S
Aug 6, 2020
State-specific requirement (broader than federal)
XXS · State Statutory or Regulatory requirements that are broader-in-scope than the federal RCRA requirements
Resolved Dec 8, 2020 S
Oct 16, 2006
RCRA 261.A
261.A · ID and Listing of HW: General
Resolved Dec 15, 2006 S
Oct 16, 2006
Generator standards
262.A · Standards Applicable to Generators of HW: General
Resolved Dec 15, 2006 S
Oct 16, 2006
State-specific requirement (broader than federal)
XXS · State Statutory or Regulatory requirements that are broader-in-scope than the federal RCRA requirements
Resolved Dec 15, 2006 S
Inspection history · canonical · 9 total
DateTypeAgencyOutcome
Dec 16, 2020 FOLLOW-UP INSPECTION (FUI) S In compliance
Aug 6, 2020 COMPLIANCE EVALUATION INSPECTION (CEI) S Violation found
Aug 4, 2009 NO LONGER A SIGNIFICANT NON-COMPLIER (SNN) S In compliance
Dec 15, 2006 NON-FINANCIAL RECORD REVIEW (NRR) S In compliance
Nov 20, 2006 COMPLIANCE EVALUATION INSPECTION (CEI) S In compliance
Oct 16, 2006 COMPLIANCE EVALUATION INSPECTION (CEI) S Violation found
Oct 16, 2006 SIGNIFICANT NON-COMPLIER (SNY) S In compliance
Dec 20, 1999 COMPLIANCE EVALUATION INSPECTION (CEI) S In compliance
Showing 8 most recent of 9.

Data sources

EPA ECHO — this facility's detailed report — facility, compliance summary, permits, evaluations & violations
RCRAInfo evaluation and violation records for this facility are integrated into the ECHO report linked above — RCRAInfo's own public search doesn't offer a stable per-facility link. General source: EPA ECHO, EPA RCRAInfo.
Compliance, permit, and location data come straight from EPA and can't be edited. Contact info and description come from the business's claimed listing, if any. This profile is not an official regulatory determination.
EPA ECHO Exporter
Source snapshot pulled Aug 11, 2026 · batch 20260811T113837Z
EPA RCRAInfo (ECHO download)
Source snapshot pulled Aug 11, 2026 · batch 20260811T113837Z
Two different dates can appear on this page, and both are correct but mean different things: "Source snapshot pulled" above is when we last pulled that source's raw data — this is the date to check for source currency. "Recalculated" on the compliance summary is when we last recomputed that summary from the data on hand, which can land on a later date than the source pull itself — a later recalculation date does NOT mean the underlying source has data through that date.