LIGHTING RESOURCES LLC
1007 SW 16TH LN, OCALA, FL, 34474
EPA public record Significant non-complier
Part of LIGHTING RESOURCES LLC — 7 EPA-regulated sites nationwide
Claim this listing
Is this your business? Add a description, contact info, and services.
Facility identity · canonical
- EPA Registry ID
- 110044938459
- RCRA Handler ID(s)
- FLR000070565
- Generator status
- Large Quantity Generator (LQG)
- County
- MARION
- EPA Region
- 04
- Active
- Yes
- NAICS
- 562920 · Materials recovery facilities562112 · Hazardous waste collection562111 · Solid waste collection562211 · Hazardous waste treatment & disposal
- Coordinates
- 29.197036, -82.116781
Compliance summary · canonical · EPA source pulled Aug 11, 2026 · summary recalculated Aug 26, 2026
3-year compliance history In violation 3, in significant non-compliance 3 of the last 12 quarters
Not in universe In violation Significant non-compliance
- Significant non-complier
- Yes
- Last inspection
- Nov 25, 2025
- Inspections (5 yr)
- 3
- Informal actions (5 yr)
- 1
- Formal actions (5 yr)
- 1
- Total penalties
- $19,360
Permits & authorizations · canonical
| Program | Type | Status | Effective |
|---|---|---|---|
| RCRA | LQG | Not reported | Not reported |
| RCRA | TSDF | Not reported | Not reported |
| RCRA | Transporter | Not reported | Not reported |
Type is EPA's RCRA handler classification. Permit status and effective date
are not published in the RCRAInfo handler dataset.
Violations · canonical · 40 total, 2 open
12 distinct violation categories on record:
| Count | Code | Category | EPA description |
|---|---|---|---|
| 10 | PCR | RCRA PCR | Violation of a permit condition or requirement |
| 5 | 262.A | Generator standards | Standards Applicable to Generators of HW: General |
| 5 | 264.D | TSDF standards (permitted) | Standards for Owners and Operators of HW TSDs: Contingency Plan and Emergency Procedures |
| 5 | XXS | State-specific requirement (broader than federal) | State Statutory or Regulatory requirements that are broader-in-scope than the federal RCRA requirements |
| 3 | 262.C | Generator standards | Standards Applicable to Generators of HW: Pre-Transport Requirements Applicable to Small and Large Quantity Generators |
| 3 | 264.B | TSDF standards (permitted) | Standards for Owners and Operators of HW TSDs: General Facility Standards |
| 3 | 264.C | TSDF standards (permitted) | Standards for Owners and Operators of HW TSDs: Preparedness and Prevention |
| 2 | 273.B | Universal waste | Standards for Universal Waste Management: Standards for Small Quantity Handlers |
| 1 | 262.B | Generator standards | Standards Applicable to Generators of HW: Manifest Requirements Applicable to Small and Large Quantity Generators |
| 1 | 262.M | Generator standards | Standards Applicable to Generators of HW: Preparedness. Prevention, and Emergency Procedures for LQGs |
| 1 | 265.I | TSDF standards (interim status) | Interim Status Standards for Owners and Operators of HW TSDs: Use and Management of Containers |
| 1 | 279.C | Used oil management | Standards for Used Oil: Generators |
Most recent 8 of 40:
| Determined | Category | Status | Agency |
|---|---|---|---|
| Sep 8, 2025 | Generator standards 262.A · Standards Applicable to Generators of HW: General | Resolved Feb 13, 2026 | S |
| Sep 8, 2025 | Generator standards 262.B · Standards Applicable to Generators of HW: Manifest Requirements Applicable to Small and Large Quantity Generators | Open | S |
| Sep 8, 2025 | TSDF standards (permitted) 264.D · Standards for Owners and Operators of HW TSDs: Contingency Plan and Emergency Procedures | Resolved Jan 23, 2026 | S |
| Sep 8, 2025 | RCRA PCR PCR · Violation of a permit condition or requirement | Open | S |
| Sep 8, 2025 | State-specific requirement (broader than federal) XXS · State Statutory or Regulatory requirements that are broader-in-scope than the federal RCRA requirements | Resolved Jan 31, 2026 | S |
| Aug 8, 2023 | Generator standards 262.A · Standards Applicable to Generators of HW: General | Resolved Nov 3, 2023 | E |
| Aug 8, 2023 | Generator standards 262.A · Standards Applicable to Generators of HW: General | Resolved Nov 3, 2023 | S |
| Aug 8, 2023 | Generator standards 262.A · Standards Applicable to Generators of HW: General | Resolved Dec 21, 2023 | E |
Inspection history · canonical · 86 total
| Date | Type | Agency | Outcome |
|---|---|---|---|
| Nov 25, 2025 | SIGNIFICANT NON-COMPLIER (SNY) | S | Violation found |
| Oct 15, 2025 | FINANCIAL RECORD REVIEW (FRR) | S | In compliance |
| Sep 8, 2025 | COMPLIANCE EVALUATION INSPECTION (CEI) | S | Violation found |
| Oct 15, 2024 | FINANCIAL RECORD REVIEW (FRR) | S | In compliance |
| Oct 15, 2023 | FINANCIAL RECORD REVIEW (FRR) | S | In compliance |
| Aug 8, 2023 | COMPLIANCE EVALUATION INSPECTION (CEI) | E | Violation found |
| Aug 8, 2023 | COMPLIANCE EVALUATION INSPECTION (CEI) | S | Violation found |
| Jan 12, 2023 | FINANCIAL RECORD REVIEW (FRR) | E | In compliance |
Showing 8 most recent of 86.
Related facilities near Ocala
No other built profiles nearby yet.
Data sources
EPA ECHO — this facility's detailed report — facility, compliance summary, permits, evaluations & violations
RCRAInfo evaluation and violation records for this facility are integrated into the
ECHO report linked above — RCRAInfo's own public search doesn't offer a stable
per-facility link. General source: EPA ECHO, EPA RCRAInfo.
Compliance, permit, and location data come straight from EPA and can't be edited.
Contact info and description come from the business's claimed listing, if any.
This profile is not an official regulatory determination.
- EPA ECHO Exporter
- Source snapshot pulled Aug 11, 2026 · batch 20260811T113837Z
- EPA RCRAInfo (ECHO download)
- Source snapshot pulled Aug 11, 2026 · batch 20260811T113837Z
Two different dates can appear on this page, and both are correct but mean different
things: "Source snapshot pulled" above is when we last pulled that source's raw data
— this is the date to check for source currency. "Recalculated" on the compliance
summary is when we last recomputed that summary from the data on hand, which can
land on a later date than the source pull itself — a later recalculation date does
NOT mean the underlying source has data through that date.