L.G. PHILLIPS DISPLAYS USA, INC.

700 NORTH PRATT STREET, OTTAWA, OH, 45875
No open violations Compliance record — not a listed provider
Compliance record, not a business listing. This facility is a hazardous-waste generator (it produces regulated waste as part of an unrelated business), not a waste-management vendor — it isn't eligible to be claimed or listed. Data below is shown for compliance transparency, sourced from EPA ECHO & RCRAInfo.

Facility identity · canonical

EPA Registry ID
110000395876
RCRA Handler ID(s)
OHD038703484
Generator status
Large Quantity Generator (LQG)
County
PUTNAM
EPA Region
05
Active
Yes
NAICS
334411
334419
334412
Coordinates
41.02434, -84.03737
Compliance summary · canonical · EPA source pulled Aug 11, 2026 · summary recalculated Aug 26, 2026
3-year compliance history Not in the compliance universe for any of the last 12 quarters
Not in universe In violation Significant non-compliance
Significant non-complier
No
Last inspection
Mar 15, 2007
Inspections (5 yr)
—
Informal actions (5 yr)
—
Formal actions (5 yr)
—
Total penalties
—
Permits & authorizations · canonical
ProgramTypeStatusEffective
RCRA LQG Not reported Not reported
Type is EPA's RCRA handler classification. Permit status and effective date are not published in the RCRAInfo handler dataset.
Violations · canonical · 97 total, 0 open
14 distinct violation categories on record:
CountCodeCategoryEPA description
24 262.C Generator standards Standards Applicable to Generators of HW: Pre-Transport Requirements Applicable to Small and Large Quantity Generators
10 264.H TSDF standards (permitted) Standards for Owners and Operators of HW TSDs: Financial Requirements
9 264.G TSDF standards (permitted) Standards for Owners and Operators of HW TSDs: Closure and Post-Closure
9 268.A Land disposal restrictions Land Disposal Restrictions: General
7 264.C TSDF standards (permitted) Standards for Owners and Operators of HW TSDs: Preparedness and Prevention
6 264.B TSDF standards (permitted) Standards for Owners and Operators of HW TSDs: General Facility Standards
5 262.A Generator standards Standards Applicable to Generators of HW: General
5 264.I TSDF standards (permitted) Standards for Owners and Operators of HW TSDs: Use and Management of Containers
5 264.J TSDF standards (permitted) Standards for Owners and Operators of HW TSDs: Tank Systems
5 265.F TSDF standards (interim status) Interim Status Standards for Owners and Operators of HW TSDs: Ground-Water Monitoring
4 262.D Generator standards Standards Applicable to Recordkeeping and Reporting Applicable to Small and Large Quantity Generators
4 264.D TSDF standards (permitted) Standards for Owners and Operators of HW TSDs: Contingency Plan and Emergency Procedures
2 264.E TSDF standards (permitted) Standards for Owners and Operators of HW TSDs: Manifest System, Recordkeeping and Reporting
2 265.J TSDF standards (interim status) Interim Status Standards for Owners and Operators of HW TSDs: Tank Systems
Most recent 8 of 97:
DeterminedCategoryStatusAgency
Mar 9, 2001
Generator standards
262.C · Standards Applicable to Generators of HW: Pre-Transport Requirements Applicable to Small and Large Quantity Generators
Resolved Feb 25, 2002 S
Mar 9, 2001
Generator standards
262.C · Standards Applicable to Generators of HW: Pre-Transport Requirements Applicable to Small and Large Quantity Generators
Resolved Mar 9, 2001 S
Mar 9, 2001
Generator standards
262.C · Standards Applicable to Generators of HW: Pre-Transport Requirements Applicable to Small and Large Quantity Generators
Resolved May 14, 2001 S
Mar 9, 2001
TSDF standards (interim status)
265.J · Interim Status Standards for Owners and Operators of HW TSDs: Tank Systems
Resolved May 14, 2001 S
Aug 18, 1998
Generator standards
262.A · Standards Applicable to Generators of HW: General
Resolved Mar 18, 1999 S
Aug 18, 1998
Generator standards
262.C · Standards Applicable to Generators of HW: Pre-Transport Requirements Applicable to Small and Large Quantity Generators
Resolved Mar 18, 1999 S
Aug 18, 1998
Generator standards
262.C · Standards Applicable to Generators of HW: Pre-Transport Requirements Applicable to Small and Large Quantity Generators
Resolved Apr 1, 1999 S
Aug 18, 1998
Generator standards
262.C · Standards Applicable to Generators of HW: Pre-Transport Requirements Applicable to Small and Large Quantity Generators
Resolved Aug 18, 1998 S
Inspection history · canonical · 46 total
DateTypeAgencyOutcome
Mar 15, 2007 FOCUSED COMPLIANCE INSPECTION (FCI) S In compliance
Mar 9, 2001 COMPLIANCE EVALUATION INSPECTION (CEI) S Violation found
Jul 29, 1999 FINANCIAL RECORD REVIEW (FRR) S In compliance
Jan 13, 1999 NO LONGER A SIGNIFICANT NON-COMPLIER (SNN) E In compliance
Aug 18, 1998 COMPLIANCE EVALUATION INSPECTION (CEI) S Violation found
Aug 11, 1998 SIGNIFICANT NON-COMPLIER (SNY) E Violation found
May 19, 1998 COMPLIANCE EVALUATION INSPECTION (CEI) E Violation found
May 13, 1998 FINANCIAL RECORD REVIEW (FRR) S In compliance
Showing 8 most recent of 46.

Related facilities near Ottawa

No other built profiles nearby yet.

Data sources

EPA ECHO — this facility's detailed report — facility, compliance summary, permits, evaluations & violations
RCRAInfo evaluation and violation records for this facility are integrated into the ECHO report linked above — RCRAInfo's own public search doesn't offer a stable per-facility link. General source: EPA ECHO, EPA RCRAInfo.
Compliance, permit, and location data come straight from EPA and can't be edited. Contact info and description come from the business's claimed listing, if any. This profile is not an official regulatory determination.
EPA ECHO Exporter
Source snapshot pulled Aug 11, 2026 · batch 20260811T113837Z
EPA RCRAInfo (ECHO download)
Source snapshot pulled Aug 11, 2026 · batch 20260811T113837Z
Two different dates can appear on this page, and both are correct but mean different things: "Source snapshot pulled" above is when we last pulled that source's raw data — this is the date to check for source currency. "Recalculated" on the compliance summary is when we last recomputed that summary from the data on hand, which can land on a later date than the source pull itself — a later recalculation date does NOT mean the underlying source has data through that date.