IT CORP BENSEN RIDGE FAC

7260 HIGHWAY 29, KELSEYVILLE, CA, 95451
No open violations Compliance record — not a listed provider
Compliance record, not a business listing. This facility is a hazardous-waste generator (it produces regulated waste as part of an unrelated business), not a waste-management vendor — it isn't eligible to be claimed or listed. Data below is shown for compliance transparency, sourced from EPA ECHO & RCRAInfo.

Facility identity · canonical

EPA Registry ID
110000912567
RCRA Handler ID(s)
CAD000633289
Generator status
—
County
LAKE
EPA Region
09
Active
Yes
NAICS
—
Coordinates
38.94942, -122.801205
Compliance summary · canonical · EPA source pulled Aug 11, 2026 · summary recalculated Aug 26, 2026
3-year compliance history In significant non-compliance 3 of the last 12 quarters
Not in universe In violation Significant non-compliance
Significant non-complier
No
Last inspection
Feb 17, 2026
Inspections (5 yr)
1
Informal actions (5 yr)
—
Formal actions (5 yr)
—
Total penalties
—
Permits & authorizations · canonical
No permits on record.
Violations · canonical · 13 total, 0 open
3 distinct violation categories on record:
CountCodeCategoryEPA description
10 262.A Generator standards Standards Applicable to Generators of HW: General
2 264.H TSDF standards (permitted) Standards for Owners and Operators of HW TSDs: Financial Requirements
1 265.F TSDF standards (interim status) Interim Status Standards for Owners and Operators of HW TSDs: Ground-Water Monitoring
Most recent 8 of 13:
DeterminedCategoryStatusAgency
Feb 29, 2016
TSDF standards (permitted)
264.H · Standards for Owners and Operators of HW TSDs: Financial Requirements
Resolved Jan 29, 2024 S
Jul 18, 2007
TSDF standards (permitted)
264.H · Standards for Owners and Operators of HW TSDs: Financial Requirements
Resolved Oct 3, 2008 S
Mar 26, 1987
TSDF standards (interim status)
265.F · Interim Status Standards for Owners and Operators of HW TSDs: Ground-Water Monitoring
Resolved Mar 9, 1988 S
Aug 28, 1986
Generator standards
262.A · Standards Applicable to Generators of HW: General
Resolved Mar 9, 1988 S
Apr 15, 1986
Generator standards
262.A · Standards Applicable to Generators of HW: General
Resolved Aug 27, 1986 E
Oct 2, 1985
Generator standards
262.A · Standards Applicable to Generators of HW: General
Resolved Mar 9, 1988 S
Jun 20, 1985
Generator standards
262.A · Standards Applicable to Generators of HW: General
Resolved Mar 9, 1988 S
Apr 1, 1985
Generator standards
262.A · Standards Applicable to Generators of HW: General
Resolved Mar 9, 1988 S
Inspection history · canonical · 41 total
DateTypeAgencyOutcome
Feb 17, 2026 FINANCIAL RECORD REVIEW (FRR) S In compliance
Feb 4, 2026 COMPLIANCE EVALUATION INSPECTION (CEI) S In compliance
Jan 29, 2024 NO LONGER A SIGNIFICANT NON-COMPLIER (SNN) S In compliance
Mar 21, 2017 FOCUSED COMPLIANCE INSPECTION (FCI) S In compliance
Feb 29, 2016 FINANCIAL RECORD REVIEW (FRR) S Violation found
Feb 29, 2016 SIGNIFICANT NON-COMPLIER (SNY) S In compliance
Oct 22, 2015 FINANCIAL RECORD REVIEW (FRR) S In compliance
Oct 13, 2015 COMPLIANCE EVALUATION INSPECTION (CEI) S In compliance
Showing 8 most recent of 41.

Data sources

EPA ECHO — this facility's detailed report — facility, compliance summary, permits, evaluations & violations
RCRAInfo evaluation and violation records for this facility are integrated into the ECHO report linked above — RCRAInfo's own public search doesn't offer a stable per-facility link. General source: EPA ECHO, EPA RCRAInfo.
Compliance, permit, and location data come straight from EPA and can't be edited. Contact info and description come from the business's claimed listing, if any. This profile is not an official regulatory determination.
EPA ECHO Exporter
Source snapshot pulled Aug 11, 2026 · batch 20260811T113837Z
EPA RCRAInfo (ECHO download)
Source snapshot pulled Aug 11, 2026 · batch 20260811T113837Z
Two different dates can appear on this page, and both are correct but mean different things: "Source snapshot pulled" above is when we last pulled that source's raw data — this is the date to check for source currency. "Recalculated" on the compliance summary is when we last recomputed that summary from the data on hand, which can land on a later date than the source pull itself — a later recalculation date does NOT mean the underlying source has data through that date.