INEOS ABS (USA) LLC - ADDYSTON PLANT

356 THREE RIVERS PKWY, ADDYSTON, OH, 45001
No open violations Compliance record — not a listed provider
Compliance record, not a business listing. This facility is a hazardous-waste generator (it produces regulated waste as part of an unrelated business), not a waste-management vendor — it isn't eligible to be claimed or listed. Data below is shown for compliance transparency, sourced from EPA ECHO & RCRAInfo.

Facility identity · canonical

EPA Registry ID
110067426654
RCRA Handler ID(s)
OHD004233003
Generator status
Large Quantity Generator (LQG)
County
HAMILTON
EPA Region
05
Active
Yes
NAICS
325211
Coordinates
39.1347, -84.7122
Compliance summary · canonical · EPA source pulled Aug 11, 2026 · summary recalculated Aug 26, 2026
3-year compliance history In violation 1 of the last 12 quarters
Not in universe In violation Significant non-compliance
Significant non-complier
No
Last inspection
Mar 6, 2025
Inspections (5 yr)
1
Informal actions (5 yr)
1
Formal actions (5 yr)
—
Total penalties
—
Permits & authorizations · canonical
ProgramTypeStatusEffective
RCRA LQG Not reported Not reported
Type is EPA's RCRA handler classification. Permit status and effective date are not published in the RCRAInfo handler dataset.
Violations · canonical · 51 total, 0 open
18 distinct violation categories on record:
CountCodeCategoryEPA description
7 262.C Generator standards Standards Applicable to Generators of HW: Pre-Transport Requirements Applicable to Small and Large Quantity Generators
6 264.E TSDF standards (permitted) Standards for Owners and Operators of HW TSDs: Manifest System, Recordkeeping and Reporting
5 264.B TSDF standards (permitted) Standards for Owners and Operators of HW TSDs: General Facility Standards
5 266.H Specific waste management Standards for the Management of Specific HW and Specific Types of HW Management Facilities: Hazardous Waste Burned in Boilers and Industrial Furnaces
4 262.A Generator standards Standards Applicable to Generators of HW: General
4 264.H TSDF standards (permitted) Standards for Owners and Operators of HW TSDs: Financial Requirements
3 264.A TSDF standards (permitted) Standards for Owners and Operators of HW TSDs: General
3 264.D TSDF standards (permitted) Standards for Owners and Operators of HW TSDs: Contingency Plan and Emergency Procedures
3 270.C Permit requirements EPA Administered Permit Programs: the HW Permit Program Permit Conditions
2 264.G TSDF standards (permitted) Standards for Owners and Operators of HW TSDs: Closure and Post-Closure
2 279.A Used oil management Standards for the Management of Used Oil: Definitions
1 262.M Generator standards Standards Applicable to Generators of HW: Preparedness. Prevention, and Emergency Procedures for LQGs
1 264.BB TSDF standards (permitted) Standards for Owners and Operators of HW TSDs: Air Emission Standards for Equipment Leaks
1 264.C TSDF standards (permitted) Standards for Owners and Operators of HW TSDs: Preparedness and Prevention
1 264.I TSDF standards (permitted) Standards for Owners and Operators of HW TSDs: Use and Management of Containers
1 264.J TSDF standards (permitted) Standards for Owners and Operators of HW TSDs: Tank Systems
1 270.B Permit requirements EPA Administered Permit Programs: the HW Permit Program Permit Application
1 279.C Used oil management Standards for Used Oil: Generators
Most recent 8 of 51:
DeterminedCategoryStatusAgency
Mar 6, 2025
Generator standards
262.M · Standards Applicable to Generators of HW: Preparedness. Prevention, and Emergency Procedures for LQGs
Resolved Mar 28, 2025 S
Mar 6, 2025
Used oil management
279.C · Standards for Used Oil: Generators
Resolved Mar 6, 2025 S
Nov 18, 2010
Generator standards
262.C · Standards Applicable to Generators of HW: Pre-Transport Requirements Applicable to Small and Large Quantity Generators
Resolved Nov 18, 2010 S
Feb 13, 2006
Generator standards
262.A · Standards Applicable to Generators of HW: General
Resolved Oct 16, 2006 E
Jan 24, 2005
TSDF standards (permitted)
264.H · Standards for Owners and Operators of HW TSDs: Financial Requirements
Resolved Mar 7, 2005 S
Oct 1, 2004
TSDF standards (permitted)
264.A · Standards for Owners and Operators of HW TSDs: General
Resolved Oct 1, 2004 S
Sep 28, 2004
Generator standards
262.A · Standards Applicable to Generators of HW: General
Resolved Jan 12, 2005 E
Oct 27, 2003
Generator standards
262.A · Standards Applicable to Generators of HW: General
Resolved Jan 5, 2004 S
Inspection history · canonical · 67 total
DateTypeAgencyOutcome
Mar 6, 2025 COMPLIANCE EVALUATION INSPECTION (CEI) S Violation found
Sep 14, 2020 COMPLIANCE EVALUATION INSPECTION (CEI) S In compliance
Jul 24, 2014 COMPLIANCE EVALUATION INSPECTION (CEI) E Undetermined
Jul 24, 2014 COMPLIANCE EVALUATION INSPECTION (CEI) S In compliance
Nov 18, 2010 COMPLIANCE EVALUATION INSPECTION (CEI) S Violation found
Mar 9, 2007 FOCUSED COMPLIANCE INSPECTION (FCI) S In compliance
May 18, 2006 FOCUSED COMPLIANCE INSPECTION (FCI) S In compliance
Mar 22, 2006 CORRECTIVE ACTION COMPLIANCE EVALUATION (CAC) S In compliance
Showing 8 most recent of 67.

Data sources

EPA ECHO — this facility's detailed report — facility, compliance summary, permits, evaluations & violations
RCRAInfo evaluation and violation records for this facility are integrated into the ECHO report linked above — RCRAInfo's own public search doesn't offer a stable per-facility link. General source: EPA ECHO, EPA RCRAInfo.
Compliance, permit, and location data come straight from EPA and can't be edited. Contact info and description come from the business's claimed listing, if any. This profile is not an official regulatory determination.
EPA ECHO Exporter
Source snapshot pulled Aug 11, 2026 · batch 20260811T113837Z
EPA RCRAInfo (ECHO download)
Source snapshot pulled Aug 11, 2026 · batch 20260811T113837Z
Two different dates can appear on this page, and both are correct but mean different things: "Source snapshot pulled" above is when we last pulled that source's raw data — this is the date to check for source currency. "Recalculated" on the compliance summary is when we last recomputed that summary from the data on hand, which can land on a later date than the source pull itself — a later recalculation date does NOT mean the underlying source has data through that date.