DERICHEBOURG RECYCLING USA
7501 WALLISVILLE RD, HOUSTON, TX, 77020
No open violations Compliance record — not a listed provider
Facility identity · canonical
- EPA Registry ID
- 110034627919
- RCRA Handler ID(s)
- TXD003897634
- Generator status
- —
- County
- HARRIS
- EPA Region
- 06
- Active
- Yes
- NAICS
- 423930
- Coordinates
- 29.78758, -95.29452
Compliance summary · canonical · EPA source pulled Jul 2, 2026 · summary recalculated Aug 26, 2026
3-year compliance history In violation 5 of the last 12 quarters
Not in universe In violation Significant non-compliance
- Significant non-complier
- No
- Last inspection
- May 27, 2025
- Inspections (5 yr)
- 2
- Informal actions (5 yr)
- 1
- Formal actions (5 yr)
- —
- Total penalties
- —
Permits & authorizations · canonical
No permits on record.
Violations · canonical · 7 total, 0 open
5 distinct violation categories on record:
| Count | Code | Category | EPA description |
|---|---|---|---|
| 3 | XXS | State-specific requirement (broader than federal) | State Statutory or Regulatory requirements that are broader-in-scope than the federal RCRA requirements |
| 1 | 265.G | TSDF standards (interim status) | Interim Status Standards for Owners and Operators of HW TSDs: Closure and Post-Closure |
| 1 | 268.A | Land disposal restrictions | Land Disposal Restrictions: General |
| 1 | 273.B | Universal waste | Standards for Universal Waste Management: Standards for Small Quantity Handlers |
| 1 | 279.C | Used oil management | Standards for Used Oil: Generators |
All violations:
| Determined | Category | Status | Agency |
|---|---|---|---|
| May 27, 2025 | TSDF standards (interim status) 265.G · Interim Status Standards for Owners and Operators of HW TSDs: Closure and Post-Closure | Resolved May 5, 2026 | S |
| May 27, 2025 | Land disposal restrictions 268.A · Land Disposal Restrictions: General | Resolved Jun 5, 2025 | S |
| May 27, 2025 | Universal waste 273.B · Standards for Universal Waste Management: Standards for Small Quantity Handlers | Resolved Nov 4, 2025 | S |
| May 27, 2025 | Used oil management 279.C · Standards for Used Oil: Generators | Resolved Nov 4, 2025 | S |
| May 27, 2025 | State-specific requirement (broader than federal) XXS · State Statutory or Regulatory requirements that are broader-in-scope than the federal RCRA requirements | Resolved Jun 5, 2025 | S |
| May 27, 2025 | State-specific requirement (broader than federal) XXS · State Statutory or Regulatory requirements that are broader-in-scope than the federal RCRA requirements | Resolved Jun 11, 2025 | S |
| May 27, 2025 | State-specific requirement (broader than federal) XXS · State Statutory or Regulatory requirements that are broader-in-scope than the federal RCRA requirements | Resolved Nov 4, 2025 | S |
Inspection history · canonical · 2 total
| Date | Type | Agency | Outcome |
|---|---|---|---|
| May 27, 2025 | COMPLIANCE EVALUATION INSPECTION (CEI) | S | Violation found |
| Mar 15, 2024 | COMPLIANCE EVALUATION INSPECTION (CEI) | E | Undetermined |
Related facilities near Houston
Data sources
EPA ECHO — this facility's detailed report — facility, compliance summary, permits, evaluations & violations
RCRAInfo evaluation and violation records for this facility are integrated into the
ECHO report linked above — RCRAInfo's own public search doesn't offer a stable
per-facility link. General source: EPA ECHO, EPA RCRAInfo.
Compliance, permit, and location data come straight from EPA and can't be edited.
Contact info and description come from the business's claimed listing, if any.
This profile is not an official regulatory determination.
- EPA ECHO Exporter
- Source snapshot pulled Jul 2, 2026 · batch 20260702T154139Z
- EPA RCRAInfo (ECHO download)
- Source snapshot pulled Jul 2, 2026 · batch 20260702T154139Z
Two different dates can appear on this page, and both are correct but mean different
things: "Source snapshot pulled" above is when we last pulled that source's raw data
— this is the date to check for source currency. "Recalculated" on the compliance
summary is when we last recomputed that summary from the data on hand, which can
land on a later date than the source pull itself — a later recalculation date does
NOT mean the underlying source has data through that date.