CLEVELAND-CLIFFS STEEL CORP - MANSFIELD FACILITY

913 BOWMAN ST, MANSFIELD, OH, 44903
No open violations Compliance record — not a listed provider
Compliance record, not a business listing. This facility is a hazardous-waste generator (it produces regulated waste as part of an unrelated business), not a waste-management vendor — it isn't eligible to be claimed or listed. Data below is shown for compliance transparency, sourced from EPA ECHO & RCRAInfo.

Facility identity · canonical

EPA Registry ID
110000391898
RCRA Handler ID(s)
OHD004157418, OHD987038346
Generator status
Large Quantity Generator (LQG)
County
RICHLAND
EPA Region
05
Active
Yes
NAICS
331110
331111
Coordinates
40.78449, -82.52327
Compliance summary · canonical · EPA source pulled Aug 11, 2026 · summary recalculated Aug 26, 2026
3-year compliance history In violation 1 of the last 12 quarters
Not in universe In violation Significant non-compliance
Significant non-complier
No
Last inspection
Feb 25, 2026
Inspections (5 yr)
2
Informal actions (5 yr)
2
Formal actions (5 yr)
—
Total penalties
—
Permits & authorizations · canonical
ProgramTypeStatusEffective
RCRA LQG Not reported Not reported
Type is EPA's RCRA handler classification. Permit status and effective date are not published in the RCRAInfo handler dataset.
Violations · canonical · 38 total, 0 open
17 distinct violation categories on record:
CountCodeCategoryEPA description
8 262.C Generator standards Standards Applicable to Generators of HW: Pre-Transport Requirements Applicable to Small and Large Quantity Generators
4 262.A Generator standards Standards Applicable to Generators of HW: General
4 264.H TSDF standards (permitted) Standards for Owners and Operators of HW TSDs: Financial Requirements
4 268.A Land disposal restrictions Land Disposal Restrictions: General
3 264.A TSDF standards (permitted) Standards for Owners and Operators of HW TSDs: General
2 270.A Permit requirements EPA Administered Permit Programs: the HW Permit Program General Information
2 270.B Permit requirements EPA Administered Permit Programs: the HW Permit Program Permit Application
2 279.A Used oil management Standards for the Management of Used Oil: Definitions
1 262.D Generator standards Standards Applicable to Recordkeeping and Reporting Applicable to Small and Large Quantity Generators
1 262.M Generator standards Standards Applicable to Generators of HW: Preparedness. Prevention, and Emergency Procedures for LQGs
1 264.B TSDF standards (permitted) Standards for Owners and Operators of HW TSDs: General Facility Standards
1 264.G TSDF standards (permitted) Standards for Owners and Operators of HW TSDs: Closure and Post-Closure
1 265.B TSDF standards (interim status) Interim Status Standards for Owners and Operators of HW TSDs: General Facility Standards
1 265.C TSDF standards (interim status) Interim Status Standards for Owners and Operators of HW TSDs: Preparedness and Prevention
1 265.D TSDF standards (interim status) Interim Status Standards for Owners and Operators of HW TSDs: Contingency Plan and Emergency Procedures
1 273.B Universal waste Standards for Universal Waste Management: Standards for Small Quantity Handlers
1 279.C Used oil management Standards for Used Oil: Generators
Most recent 8 of 38:
DeterminedCategoryStatusAgency
Feb 25, 2026
Generator standards
262.A · Standards Applicable to Generators of HW: General
Resolved Feb 27, 2026 S
Feb 25, 2026
Generator standards
262.M · Standards Applicable to Generators of HW: Preparedness. Prevention, and Emergency Procedures for LQGs
Resolved Feb 27, 2026 S
Feb 25, 2026
Used oil management
279.C · Standards for Used Oil: Generators
Resolved Feb 27, 2026 S
Nov 2, 2009
Generator standards
262.C · Standards Applicable to Generators of HW: Pre-Transport Requirements Applicable to Small and Large Quantity Generators
Resolved Sep 21, 2016 E
Nov 2, 2009
TSDF standards (interim status)
265.C · Interim Status Standards for Owners and Operators of HW TSDs: Preparedness and Prevention
Resolved Sep 21, 2016 E
Nov 2, 2009
Permit requirements
270.A · EPA Administered Permit Programs: the HW Permit Program General Information
Resolved Sep 21, 2016 E
Nov 2, 2009
Permit requirements
270.B · EPA Administered Permit Programs: the HW Permit Program Permit Application
Resolved Sep 21, 2016 E
Nov 2, 2009
Universal waste
273.B · Standards for Universal Waste Management: Standards for Small Quantity Handlers
Resolved Sep 21, 2016 E
Inspection history · canonical · 32 total
DateTypeAgencyOutcome
Feb 25, 2026 COMPLIANCE EVALUATION INSPECTION (CEI) S Violation found
Dec 1, 2023 FOCUSED COMPLIANCE INSPECTION (FCI) S In compliance
Sep 17, 2021 COMPLIANCE EVALUATION INSPECTION (CEI) S In compliance
Dec 16, 2019 FOCUSED COMPLIANCE INSPECTION (FCI) S In compliance
Sep 21, 2016 NO LONGER A SIGNIFICANT NON-COMPLIER (SNN) E Violation found
Aug 30, 2016 COMPLIANCE EVALUATION INSPECTION (CEI) S In compliance
Nov 2, 2009 COMPLIANCE EVALUATION INSPECTION (CEI) E Violation found
Jul 28, 2008 SIGNIFICANT NON-COMPLIER (SNY) E Violation found
Showing 8 most recent of 32.

Data sources

EPA ECHO — this facility's detailed report — facility, compliance summary, permits, evaluations & violations
RCRAInfo evaluation and violation records for this facility are integrated into the ECHO report linked above — RCRAInfo's own public search doesn't offer a stable per-facility link. General source: EPA ECHO, EPA RCRAInfo.
Compliance, permit, and location data come straight from EPA and can't be edited. Contact info and description come from the business's claimed listing, if any. This profile is not an official regulatory determination.
EPA ECHO Exporter
Source snapshot pulled Aug 11, 2026 · batch 20260811T113837Z
EPA RCRAInfo (ECHO download)
Source snapshot pulled Aug 11, 2026 · batch 20260811T113837Z
Two different dates can appear on this page, and both are correct but mean different things: "Source snapshot pulled" above is when we last pulled that source's raw data — this is the date to check for source currency. "Recalculated" on the compliance summary is when we last recomputed that summary from the data on hand, which can land on a later date than the source pull itself — a later recalculation date does NOT mean the underlying source has data through that date.